Site-96 Incident Summary

This report details the recent anomalous activity detected at Site-96 on date. At approximately time, multiple staff reported experiencing bizarre sensory distortions. Early analysis suggest the anomaly is centered around the research wing. A team of containment specialists has been dispatched to Site-96 and attempts at containment are underway. Further details will be provided as they become available.

Secure Containment Protocols: Site-96 Update

Recent occurrences at Site-96 have necessitated a review and revision of existing containment protocols. The primary concern stems from the anomalous manifestation exhibited by SCP-number. This alteration in behavior presents a potential threat to both personnel and the surrounding environment. To mitigate this risk, several strategies have been enacted. A new containment cell, constructed with augmented materials, has been deployed for SCP-number. Additionally, personnel rotations will be adjusted to minimize exposure and potential contamination. All personnel are reminded to adhere strictly to the revised protocols outlined in document number.

  • Specific protocol changes remain classified pending further analysis.

Record Log: Site 96 - Personnel Confidential

Subject Numbered designations remain heavily Blacked out. Initial Dispatch records for Agent Jones, designated as Task Force Omega lead, are Corrupted. Evidence suggests a potential Violation during the initial Interaction with SCP-96. Further analysis of recovered data is required to determine the full extent of the Incident.

  • Supplemental log entries are currently Pending for declassification review.
  • Site security protocols Were/Are/Have Been implemented following the incident, including but not limited to, increased perimeter Monitoring, access restrictions, and mandatory De-briefings.

Their primary objective remains containment of SCP-96 and mitigation of any Consequential effects.

Incident Record: Site-96 Breach Protocol Activated

At approximately hour:minute hours on date, a containment breach was detected at Site-96. The breach involved an unidentified entity of unknown origin and potential danger level. All personnel have been directed to execute here the established breach protocol, designated as "Red Scale". Current reports indicate heavy resistance from SCP-number and significant system damage. A full evaluation is underway to determine the extent of the breach and the status of all personnel. Further updates will be disseminated as they become available.

Designated Termination Procedures

This document outlines the procedure for authorizing termination actions within Site-96. Access to this information is strictly limited to designated personnel as listed below. Any unauthorized access or dissemination of this document will result in disciplinary action.

  • Authorized Staff:
    • Director of Site-96
    • Site Overseer
  • High Command Approval

All terminations must be approved in writing and adhere to the strict protocols outlined in Annex 1: Site-96 Operational Directive|Appendix B: Security Clearance Levels}. Failure to comply with these regulations may result in severe consequences.

Petition Denied

Following detailed review of the filed request for de-classification pertaining to Site-96, the Deciding Committee has issued a formal denial. The causes behind this decision are confidential and will not be disclosed at this time. Additionally, any subsequent requests regarding Site-96 will be subject to the same rigorous scrutiny and may result in similar outcomes.

  • Please refrain from seeking any illegitimate access to information concerning Site-96.
  • Any violations of this directive will be met with disciplinary action.

Leave a Reply

Your email address will not be published. Required fields are marked *